|
|
CREDENTIALS
|
|
|
|
|
|
20th
January 1999
Acoustics India Pvt Ltd
Noise Pollution Control Dinv,
377, Rajaram Salai
KK Nagar, Tiruchirapalli - 620 021.
Fax No : 0431 - 459146
Attn : S.Thayala Moorthy
Sub : Acoustic Hoods for Fans
In our Project, you have supplied acoustic hoods for
convertor blower, which is found to be satisfactory.
We have some more requirement for acoustic hoods for
various fans in different areas. We request you to
depute your representative, who can evaluate our requirement
and make an offer. Meanwhile, we request you to send
us your product brochure. Please inform us the date
of your representative's visit.
Regards,
(Sd/-)
K.C.D. Khandelwal
Vice President(Smelter)
|
|
|
|
|
|
|
BOKARO STEEL PLANT
|
|
|
|
| Ref
No : S/AQ/4/59-358 |
Date
: 01/6/95
|
From
:Superintendent
A.C.V.S (Compressor Plant) |
To
: D.G.M.(P)/HRM |
Attn:
Sri. R.L.Prasad
Sub: Final acceptance certificate inrespect of
Acoustic system at CCP-2.
Ref: Agreement No. TC/M/Agt-730,731 & 732 dt.28-12-94.
IRU case
no : TIP/C/03-10/89.01/1051.
It
is intimated that Acoustic system of CCP-2 has been
commissioned on 03-05-95 and taken over by us on 26-5-95.
The system installed as a whole is working satisfactorily
since then. It was supposed to bring down the noise
level within 85dba as per our Tender specification.
After testing by Environment control department on
03-05-95 its noise level was below 85dba. Also in
many places noise level was found 80dba and average
so this system is finally acceptable to us.
(Sd/-)
A.Tiwari
Supt,. A.C.V.S
Compressor Plant
|
|
|
|
|
|
|
|
|
|
| |
No.PBS/2-16/91/556
Bhilai, Dt. 8th March, 91
|
To
M/S Acoustics India
Tiruchirappally. |
|
Sub: Installation and performance test of sound
Proof Cabin against A/T
No. B/Pur-90/95.0(2)/30643 dated 31/10/1990.
Dear
Sirs,
This
is to certify that 1 No. Sound Proof Cabin supplied
by you against order under reference has been received
and installed satisfactorily. The cabin conforms to
all technical details stipulated. The noise level
inside the cabin during performance test has also
been found to be within stipulated level of 70 to
75 dBA.
Thanking
You,
(Sd/-)
Yours faithfully,
for SAIL, Bhilai Steel Plant
(V.Shyamsundar)
Sr.Manager I/C
Power & Blowing station
|
|
|
|
|
|
|
|
|
TRAVANCORE
TITANIUM PRODUCTS LIMITED
|
|
|
TO
WHOM SO EVER IT MAY CONCERN
This
is to certify that M/s. ACOUSTICS INDIA, TRICHIRAPALLY,
undertook Design, Engineering, manufacture, supply
and Acoustic Treatment of Boiler Feed Pump house and
the Noise level was brought down from 105.2 dBa to
74.4 dBa as against a guranteed Noise level of 85
dBa.
(Sd\-)
Head of Commercial Dept
|
|
|
|
|
|
|
|
|
|
TO
WHOM SO EVER IT MAY CONCERN
This
is to certify that the Discharge Silencer manufactured
by Acoustics India for the waste Gas Fan of 0.928
million m3/hr at 1600 capacity,
is working satisfactorily at our Sinter Plant No.2.
The noise level after installation of the Silencer
is measured as 83.6 dBa as against a guranteed Noise
level of 85 dBa.
(Sd\-)
For The Tata Iron & Steel Co.Ltd..
CHIEF
ENGINEER
(MODERNISATION)
|
|
|
|
|
|
|
|
|
|
TO
WHOM SO EVER IT MAY CONCERN
M/s. ACOUSTICS INDIA, has supplied and erected a sound
proof enclosure for 110KVA DG set at our works and
the performance of the enclosure is found to be satisfactory
since 18 months of installation. We have achieved
84.6dBA (averaged over six samples) noise level at
a distance of 1 meter around the DG set as against
guaranteed noise level of 85dBA.
(Sd\-)
for L & T Gould Limited
(R.S.
MADHAVA MURTHY)
Date: 13-10-1992
|
|
|
|
|